Weber Basin Water Conservancy District will be accepting bids from licensed contractors for surface preparation and painting of steel items at the Lost Creek Dam, Causey Dam, and Gateway Penstock. Work will include removal of existing lead-based paints, surface preparation, and painting of steel piping, pumps, valves, brackets, railings, platforms, supports, etc. This project will also include replacing existing steel hydraulic lines at the Lost Creek Dam. The hydraulic lines are about 250' long and are used to operate the dam's guard gate. Bids will be due by 2:00 PM Local Time on Tuesday, October 22, 2019 at the District's administrative offices (2837 East Highway 193, Layton, UT 84040).  A public bid opening will be held at that time.  Bids received after this deadline will not be considered.

A detailed description of the project and instructions for preparing and submitting a bid can be obtained by contacting Samuel Sorensen at This email address is being protected from spambots. You need JavaScript enabled to view it. or 801-771-1677.  Any questions regarding this project shall be addressed to Sam.